Bio2Watt - Waste-to-Value

Bio2Watt developed and operated the Bronkhorstspruit Biogas Plant, Africa’s first industrial-scale waste-to-energy facility with private off-taker BMW. The plant has an installed capacity of 4.6 MW of electricity (COD achieved in July 2017) with a planned expansion of a further 5.2 MW to achieve a 9.8 MW installed capacity.

Through both Climate Investor One & Two, CFM is also supporting the growth of a pipeline of future Bio2Watt projects throughout Sub-Saharan Africa.

Technology:
Waste-to-Energy
Location:
South Africa
Capacity:
4.6
E&S categorisation:
B+
Date of initial investment:
May 2022

The Red Sea Power project is still under construction, so it is not generating direct impact yet.

The ex-ante and ex-post impacts of this investment will be posted here once available.

Climate

Avoided GHG emissions (tCO2eq/yr)
6,377
Renewable power production (GWh/yr)
5
Installed renewable energy capacity (MW/yr)
-

People

Jobs
65
People Served
-

The ex-ante and ex-post impacts of this investment will be posted here once available.

The Red Sea Power project is still under construction, so it is not generating direct impact yet.

Climate

Avoided GHG emissions (tCO2eq)
8,752
Total renewable power production (GWh)
11
Installed renewable energy capacity (MW)
5

People

Jobs
65
People Served
-

The ex-ante and ex-post impacts of this investment will be posted here once available.

Climate

Avoided GHG emissions (tCO2eq/yr)
-
Renewable power production (GWh/yr)
-
Installed renewable energy capacity (MW/yr)
-

People

Jobs
75–104
People Served
-

Stories from our communities

The following featured stories are from the community development programme of this project.

Empowering Rural Youth with Renewable Energy Skills and Entrepreneurship

Empowering Rural Youth with Renewable Energy Skills and Entrepreneurship

Read more ➞